The item. The turf-equipment plant stamps a mower deck bracket on its own press. Assembly uses 200 brackets a year, and while the press runs it makes them at 600 a year. Each run makes 300 brackets, and the plant lets up to 40 brackets be owed to assembly before a run starts. Starting a run costs $150, holding a bracket costs $6 a year, and owing one costs $30 a year. There is no charge per bracket short (\(\pi = 0\)).

Notation. \(\lambda\) is the demand rate and \(p\) the production rate, in brackets per year. \(Q\) is the run size and \(\hat{B}\) the most owed; \(\hat{I}\) is the peak on hand. \(T_1\) to \(T_4\) are the four segments of the cycle, in order: the backorders are cleared, the stock is built, the stock is used up, the backorders build. \(T_p\) is the time the press runs. \(\bar{I}\) and \(\bar{B}\) are the average on hand and the average owed, and \(k\), \(h\) and \(b\) are the three costs.

Part A. Predict

Before computing anything: a classmate says the peak on hand is \(Q - \hat{B} = 300 - 40 = 260\) brackets. Is that too high, too low, or right? Why?

Part B. The cycle by its rates

  1. Compute \(T_p\), \(\hat{I}\), and the four segment lengths, in years.
  2. Check: what must the four segments sum to? Does yours?
  3. How many months does the press run in each cycle, and for how many months is assembly owed brackets? Show the conversion.

Part C. Draw it to scale

Start at time 0, when a run begins and 40 brackets are owed. Draw two full cycles of net inventory on the grid. Label the four segments, and write each line’s slope beside it, in brackets per year.

Draw on graph paper, with time from 0 to 3 years across and net inventory from \(-60\) to 200 brackets up.

Part D. The averages and the cost

  1. Compute \(\bar{I}\) and \(\bar{B}\) from the triangles on your drawing: each average is a triangle’s area divided by the cycle length.
  2. Check your drawing: the peak on hand and the most owed together account for the part of each run that survives assembly’s use, \(\hat{I} + \hat{B} = Q(1 - \lambda/p)\). Does yours?
  3. Compute the cost rate, \(k\lambda/Q + h\bar{I} + b\bar{B}\), in dollars a year, and say which of the three terms is largest.

Part E. From the cycle to the economic order quantity

Switch off two things: the press makes a run instantly (\(p \to \infty\)), and assembly may never be owed a bracket (\(\hat{B} = 0\)).

  1. Sketch one cycle of the new line, dashed, on your grid. What are \(\hat{I}\) and \(\bar{I}\), in terms of \(Q\)?
  2. Write the cost rate \(C(Q) = k\lambda/Q + h\bar{I}\) as a function of \(Q\) alone. Differentiate it, set the derivative to zero, and solve for \(Q^{*}\), one step to a line.
  3. Show that your \(Q^{*}\) is a minimum and not a maximum.
  4. Compute \(Q^{*}\) for the bracket, and the cost rate at \(Q^{*}\) and at the plant’s run of 300 in this switched-off model. What does running 300 cost?

Exit ticket (tear off and hand in)

Name: ____________________

  1. In one sentence: what does the factor \((1 - \lambda/p)\) measure?
  1. Why does a model forbid backorders by letting \(b \to \infty\) and not by setting \(b = 0\)?