Chapter 5 Self-Checks
Dynamic Lot Sizing
These questions follow the order of Chapter 5. Each of the first four groups checks one or more sections of the chapter, and the last group reviews the whole chapter, the rolling horizon and the choice of a method included. The “Self-check” buttons in the chapter lead to these groups. Nothing you answer is recorded.
The Problem and What a Plan Costs
1. The mower deck belt averages 153.33 belts a month, and the economic order quantity on that average is 303.3 belts. Why does the chapter say that this quantity means very little for the belt?
2. True or False: if the belt costs $50 through June and $54 afterwards, the purchase term can still be dropped from the cost of a plan, because every feasible plan buys the same 1,840 belts.
3. A plan for the belt orders in months 1, 4, 5, 7, 10 and 12, each order covering the requirements up to the next one, with \(k = \$300\) and \(h = \$1.00\) per belt per month. What is its relevant cost?
Two Properties That Make the Problem Small
1. What does the zero-inventory ordering property say about an optimal plan?
2. With \(k = \$300\) and \(h = \$1.00\), what is the window cost \(w(7, 11)\) of an order in month 7 covering months 7 through 11, whose requirements are 120, 40, 0, 80 and 180 belts?
3. True or False: because a window cost never decreases as the window is extended, each period added to a window adds at least as much as the period before it did.
4. Keep the belt’s requirements and \(h = \$1.00\), but suppose an order costs $250 instead of $300. Besides month 1, which always orders because the year starts empty, which months does the requirement test \(d_t > k_t/h_{t-1}\) force to hold an order?
Choosing the Order Periods
1. In the shortest path network for the belt, what does the arc from node 3 to node 6 stand for?
2. Column 8 of the recursion for the belt reads \(V(4) = 900\), \(V(5) = 1{,}200\), \(V(6) = 1{,}460\) and \(V(7) = 1{,}620\), with window costs \(w(5,8) = 920\), \(w(6,8) = 500\), \(w(7,8) = 340\) and \(w(8,8) = 300\). The candidates with the last order before month 5 all exceed $2,300. What are \(V(8)\) and \(S(8)\)?
3. The belt and a second belt for another mower share a receiving dock that can take at most 600 belts a month in total. You want the plan of least cost for the two together. Which method of the chapter applies?
The Heuristics and What They Cost
1. Part-period balancing extends a window until what it carries comes as close as it can to \(k_t\). Counted in part-periods, about how much does a window for the belt carry when the rule stops, with \(k = \$300\) and \(h = \$1.00\)?
2. Least unit cost places its second order for the belt in month 4. From the table of window costs, \(w(4,4) = 300\), \(w(4,5) = 720\) and \(w(4,6) = 1{,}240\), and the requirements of months 4, 5 and 6 are 300, 420 and 260 belts. How many belts does the order in month 4 buy?
3. True or False: on the mower deck belt, Silver-Meal gives the cheapest plan of the three heuristics, as the studies over many generated problems would lead you to expect.
4. An item’s twelve monthly requirements alternate 100, 200, 100, 200, and so on, averaging 150 units a month. Which method does the chapter’s test call for?
Review of the Whole Chapter
1. True or False: when the belt is replanned every month on a rolling horizon, the Wagner-Whitin algorithm still guarantees the least realized cost, because it is optimal for every problem it is handed.
2. With a two-month window, the plan made in month 2 called for an order of 120 belts in month 3, and when month 3 arrived the planner ordered 420. What does the chapter call this instability of a recomputed plan?
3. The belt is replanned every month as the forecasts are revised. Its requirements give \(VC = 0.619\), and nothing limits an order or the storage. Which method does the chapter’s table for choosing a method recommend?
4. Suppose the belt’s order cost was measured as $900 when it is really $300, a ratio \(k/h\) wrong by a factor of three. The recursion run at $900 orders in months 1, 4, 6 and 11, and the ending balances of that plan sum to 1,460 belt-months. What does the plan cost at the true costs, and what is its penalty against the optimum of $2,480?