Chapter 7 Self-Checks
Single-Period Stochastic Inventory
These questions follow the order of Chapter 7. Each of the first four groups checks a run of sections of the chapter, and the last group reviews the whole chapter. The “Self-check” buttons in the chapter lead to these groups. Nothing you answer is recorded.
The Decision and the Critical Ratio
1. At the optimum, \(F(Q^{*}) = c_{u}/(c_{u}+c_{o})\), which is 0.5422 for the belt. What probability is the critical ratio?
2. Return to the five-point sketch of the belt’s demand, with \(P\{X \le x\} = 0.15\), 0.40, 0.70, 0.90 and 1.00 at 300 through 700 belts. The scrap dealer now offers $35 a belt rather than $12, and the belt still costs $50 and sells for $95. How many belts should the distributor order?
3. True or False: the expected profit and the expected cost differ by \((s-c)E[X]\), which is $20,941.44 for the belt. Since that is a large amount, maximizing the expected profit gives a different order from minimizing the expected cost.
4. In the marginal analysis of the belt, the distributor stops at the first hundred whose net is negative. Why is stopping there correct?
Getting a Demand Distribution
1. Weekly demand for the belt has a sample mean of 33.2404 and a sample variance of 613.0387. Before anything is fitted, which family does that summary leave in contention?
2. The distributor records what it shipped each week. In some weeks the belt ran out. What does fitting a distribution to that record do?
3. Suppose the belt’s 104-week history had demand in only 52 of its weeks. How should the history be classified before it is handed to the fitting procedure?
Continuous and Discrete Demand
1. Return to the spare transformer: Poisson demand with \(\lambda = 6\), a cost of $3,800, and an emergency purchase at $9,500. Suppose a transformer not used now scraps at $2,000 rather than $900. From the table, \(F(3) = 0.1512\), \(F(4) = 0.2851\), \(F(7) = 0.7440\) and \(F(8) = 0.8472\). How many spares should be bought?
2. True or False: at the optimal order of a discrete newsvendor, \(F(Q^{*})\) equals the critical ratio.
3. The fourteen-week total for the belt has \(\sigma = 92.64\) belts, and the transformer’s Poisson demand has \(\sigma = \sqrt{6} = 2.45\). For which of the two is rounding a normal approximation a safe way to set the order?
4. The fitted weekly demand is negative binomial with \(\hat{p} = 0.054222\) and \(\hat{r} = 1.9057\), and the fourteen weeks are independent. What is the distribution of the fourteen-week total?
Extensions, Simulation, and Many Periods
1. Before the deck was withdrawn, a belt left over at the end of a week was sold the next week. The margin is $45 and holding costs $1.00 per belt per month. Which overage cost belongs in the critical ratio for an ordinary week?
2. True or False: simulating the final buy with 100,000 replications, and finding the estimate at \(Q = 469\) to be $17,893.03 with a half-width of $26.31, proves that 469 belts is the right order.
3. The ordinary-week belt is solved by a base-stock policy that orders up to \(S^{*}\) every week. Which one of these changes keeps a base-stock policy optimal?
Review of the Whole Chapter
1. The transformer is a one-time buy: Poisson demand with a mean of 6, and no use for a spare after the project. Which row of the chapter’s table for choosing a model applies?
2. For the transformer at \(Q = 8\), the hand table gives an expected shortage of \(G^{1}(8) = 0.3140\). What is the expected number of transformers left over?
3. True or False: with the belt’s critical ratio of 0.5422, the distributor should plan to run out in about 54% of futures.
4. Choosing the order with a normal, 475 belts, costs $3,061.28 under the exact negative binomial, against $3,055.38 at the exact answer of 469, a penalty of 0.19%. Why is the choice of family so cheap for the final buy?