This page finds the best order quantity under a price schedule you enter, by the procedures of Chapter 3 for all-units and incremental discounting. It lists every candidate the procedure considers, the cost of each, and the one it keeps, and it draws the cost the buyer actually faces. It starts from the chapter’s all-units example; Reset returns to it. The page runs in your browser and records nothing. Its formulas are a restatement in JavaScript of the book’s code, and they are tested against that code.

What This Page Assumes

  • The item. One item, demanded at a constant rate \(\lambda\), replenished instantaneously, with no shortages: the classical economic order quantity with a price that depends on the order quantity.
  • The costs. A fixed cost \(k\) per order and a carrying charge \(i\) per year on the value held, so that the holding cost follows the price paid.
  • The schedule. One price per line, as a break point and a unit price separated by a comma. The first break point is 0, the break points rise, and the prices fall.
  • The scheme. All-units prices the whole order at the rate its size reaches; incremental prices only the units above each break point at the lower rate.
NoteFor anything else, use the software

Discounts with finite production or planned backorders, or a schedule in which the price rises, are outside these procedures. The code the chapter teaches, in Using the Software, evaluates any policy under any schedule.

Your Schedule

The plot is the total cost a year against the order quantity, purchase included, which is the cost the buyer faces. Under all-units discounting it drops at each break point; under incremental discounting it bends there instead. The gray dots are the candidates, and the large red one is the order the procedure keeps.

Things to Try

  1. The starting schedule is the chapter’s all-units example. The $10 price has its EOQ at 400, inside its interval; the $9 price has its EOQ at 422, below its break point of 500, so the break point joins the candidates. Ordering 500 costs $73,155 a year against $81,200 for 400.
  2. Choose Incremental and enter the chapter’s incremental example: \(\lambda = 3{,}000\), \(k = \$50\), \(i = 0.30\), and the schedule 0, 3 / 500, 2.97 / 1500, 2.95. Only the second level’s EOQ, 661.6, lies in its own interval, and the total is $9,501.73.
  3. Back on the all-units example, lower the discount to $9.90. The break point still wins, $80,422.50 against $81,200, but the saving falls from $8,045 to $777.50, and the drop in the cost curve at 500 is a tenth of what it was: $807.50 against $8,075.