Explore: The Depot’s Delay

Chapter 10, Multi-Echelon Inventory Systems

This explorer runs METRIC and VARI-METRIC side by side on the utility’s transformers of Chapter 10. Four storerooms alike each see \(\lambda_j = 45\) failures a year, rebuild \(\phi_j = 0.3\) of them locally in \(T_j = 30\) days, and wait \(O_j = 10\) days for a unit shipped from the depot. The depot repairs what it receives in \(T_0\) days. Move the depot’s stock and watch the delay it imposes reach every storeroom at once; move a storeroom’s stock and watch the two models part company.

Recall the chain. The depot sees \(\lambda_0 = \sum_j (1-\phi_j)\lambda_j\), its pipeline is Poisson with mean \(\mu_0 = \lambda_0 T_0\), its backorders give the delay by Little’s Law, and the delay enters each storeroom’s pipeline:

\[ \begin{aligned} \bar{W} &= \frac{\bar{B}_0(S_0)}{\lambda_0},\\ \mu_j &= \phi_j\lambda_j T_j + (1 - \phi_j)\lambda_j\left(O_j + \bar{W}\right). \end{aligned} \]

METRIC takes the storeroom’s pipeline to be Poisson at that mean. VARI-METRIC adds its variance, with \(f_j = (1-\phi_j)\lambda_j/\lambda_0\) the storeroom’s share of the depot’s requests,

\[ \begin{aligned} \sigma_j^{2} &= \phi_j\lambda_j T_j + (1-\phi_j)\lambda_j O_j\\ &\quad + f_j(1-f_j)\bar{B}_0 + f_j^{2}\,\mathit{Var}[B_0], \end{aligned} \]

and fits a negative binomial to the two moments. The page runs in your browser and records nothing. Its formulas are a restatement in JavaScript of the book’s code, and they are tested against that code. For a system of your own, use the general explorer.

The Two Levels

The first plot is the delay against the depot’s stock, at the repair time you chose. Each unit added at the depot shortens it by less than the unit before. The red dot is your depot.

The second plot is the distribution of the units in one storeroom’s pipeline under each model. Notice that they share a mean and that the negative binomial is wider at both ends; the dashed line is the storeroom’s stock, and everything to its right is a backorder.

The third plot holds the depot where you set it and varies the storerooms’ stock. The dots mark your storerooms’ stock. The gap between the two lines is what METRIC conceals, and notice that it widens as the storerooms hold more: backorders are a tail quantity, and the tail is where the two distributions differ.

Things to Try

  1. Start at the utility’s plan, \(S_0 = 16\) and \(S_j = 4\). The depot owes 5.0201 units, a request waits 14.54 days, and each storeroom has 3.2276 units in resupply. METRIC reports 0.4055 backorders a storeroom and VARI-METRIC 0.4815, 18.8% more, from a variance of 3.9527 against the Poisson’s 3.2276.
  2. Step the depot from 16 to 22. The delay falls to 3.64 days and the storeroom pipeline to 2.2863 units, at all four storerooms at once, and METRIC’s backorders fall to 0.1238 a storeroom.
  3. Set the depot’s stock to 0. Every request waits the full 60 days of repair, and the two models report the same 13.0342 backorders in all: with no stock at the depot its backorders are its pipeline, whose variance equals its mean.
  4. Return the depot to 16 and raise the storerooms to 8. METRIC reports 0.0345 backorders in all and VARI-METRIC 0.0878, two and a half times as many. A planner sizing the storerooms with METRIC would believe the plan does better than it does.
  5. Return the storerooms to 4 and shorten the depot’s repair to 45 days. VARI-METRIC reports 0.6091 backorders in all. At 60 days the depot needs 22 units, not 16, to do as well (0.6005): that is the repair contract of the chapter’s worksheet example.

Check What You Found

Check what you found

1. On the utility’s plan, \(S_0 = 16\) and \(S_j = 4\), both models give each storeroom a pipeline mean of 3.2276 units, yet VARI-METRIC reports 0.4815 backorders a storeroom where METRIC reports 0.4055. Where does the difference come from?