Agenda

  • The four-block layout every worksheet in Chapter3Models.xlsx shares
  • The classic sheet, its units column, and the reorder point as one MOD call
  • The production sheet: the order model with a different holding rate
  • Discount schedules as computed columns, and an evaluator that is not an optimizer
  • What the worksheets do not do
  • The same models in code: build, choose, evaluate, and read the answer
  • One evaluator row checked by hand

The Four-Block Layout

Block Contents Role
Inputs \(\lambda\), \(c\), \(i\), \(k\), \(L\), and \(p\) where the model has one, each with its units beside it the only cells anyone types into
Intermediate calculations quantities derived from the inputs alone, such as \(h = ic\) and \(1 - \lambda/p\) names the pieces the formulas are built from
Outputs for any \(Q\) frequency, cycle time, average inventory, each cost, at a quantity that is typed in the evaluator
Outputs for \(Q^{*}\) the same rows recomputed at the optimum the optimizer

Three rows join the two output blocks: the ratio, the difference and the relative error of the evaluated cost against the optimum. They are the sensitivity analysis built into the sheet: type any quantity and its penalty appears.

Every input carries a units label in the adjacent cell, and every quantity has a ROUNDUP companion, so the integer that would be ordered sits beside the number the formula produced.

The Classic EOQ Sheet

Set up in months: \(\lambda = 100\), \(c = \$8\), 25% a year entered as \(0.25/12\), \(k = \$20\), \(L = 0.25\) month.

\[ \begin{aligned} h &= \tfrac{0.25}{12}(8) = \$0.16667 \text{ per unit-month} &&\text{intermediate}\\ Q^{*} &= \sqrt{2(20)(100)/0.16667} = 154.92 &&\text{optimizer}\\ T^{*} &= 154.92/100 = 1.5492 \text{ months} &&\\ k\lambda/Q^{*} &= hQ^{*}/2 = \$12.91 &&\text{the balance check} \end{aligned} \]

Typing 155 into the evaluator returns a relative error of \(1.4\times 10^{-7}\); 150 or 160 return 0.052%; 200 returns 3.3%.

If 0.25 had been entered against a monthly demand, \(h\) would be twelve times too large and \(Q^{*}\) would be 44.7, wrong by a factor of \(\sqrt{12}\). Nothing in the arithmetic signals it. The units label is the only guard.

The Formula View, and One MOD

The reorder point is one cell:

= MOD(lead time, cycle time) * demand rate

MOD(L, T) returns \(L - \lfloor L/T \rfloor T\), the part of the lead time not covered by orders already outstanding. When \(L < T\) the floor is zero and it collapses to \(\lambda L\). One cell handles both cases with no IF.

Notice one detail only the formula view reveals: the evaluator’s order quantity is a reference to the optimizer’s \(Q^{*}\), not a typed number. The evaluator opens at the optimum, and typing over that one cell is the intended way to use it.

The Production Sheet: No New Formula

The sheet does not implement the production quantity at all. It builds

\[ \frac{\lambda}{p}, \quad 1 - \frac{\lambda}{p}, \quad h' = h\left(1 - \frac{\lambda}{p}\right) \]

and applies the ordinary EOQ formulas to \(h'\): the production model is the order model with a different holding rate.

A guard sits beside the production rate:

= IF(demand rate >= production rate,
     "Infeasible production rate",
     "Production rate feasible")

At \(p = \lambda\), \(h' = 0\) and a division by zero; below it, a square root of a negative number. Neither failure explains itself, so the sheet explains it first.

Reading the Production Sheet

\(\lambda = 2{,}500\), \(p = 10{,}000\) a year, \(c = \$2\), \(i = 0.30\), \(k = \$50\).

\[ \begin{aligned} h &= 0.60, \quad 1 - \lambda/p = 0.75, \quad h' = 0.45 &&\text{intermediate}\\ Q^{*} &= \sqrt{2(50)(2500)/0.45} = 745.36 &&\text{EOQ on } h'\\ k\lambda/Q^{*} &= h'Q^{*}/2 = \$167.71 &&\text{balance survives}\\ \hat{I} &= 745.36(0.75) = 559.02, \quad \bar{I} = 279.51 &&\text{the peak, the average}\\ T &= 745.36/2500 = 0.2981, \quad T_p = 745.36/10{,}000 = 0.0745 &&\text{cycle, run time} \end{aligned} \]

The check: the machine runs \(0.0745/0.2981 = 0.25\) of the time, which is \(\lambda/p\), as it must be. That check catches an error in either the cycle length or the replenishment period.

Discount Schedules as Columns

The price schedule is a table, one row per level, and each step of the procedure is a computed column:

Column Formula Step
EOQ \(\sqrt{2k\lambda/(ic_j)}\) 1, the candidate at each price
TC(EOQ) \(c_j\lambda + \sqrt{2k\lambda ic_j}\) its cost
Feasible? IF(AND(lower <= EOQ, EOQ <= upper), "Yes", "No") 2, is the price available there
TC(Lower Limit) \(c_j\lambda + k\lambda/q_j + ic_jq_j/2\) 3, the cost at the break point

Reading the All-Units Sheet

\(\lambda = 600\), \(k = \$8\), \(i = 0.20\):

Level \(q_j\) \(c_j\) \(Q_j^{*}\) Feasible? \(\mathit{TC}(Q_j^{*})\) \(\mathit{TC}(q_j)\)
1 0 $0.30 400.00 Yes 204.00
2 500 $0.29 406.84 No 198.10
3 1000 $0.28 414.04 No 200.80

Order 500. Level 3 is the instructive row: its unconstrained candidate would cost $191.19, lower than anything in the table, but 414 units cannot be bought at $0.28, and the 1,000 needed to reach that price cost more to hold than the price cut returns.

Stopping at the first feasible level would choose $204.00; taking the lowest number would choose a quantity that is not for sale. The columns enumerate the candidates and cannot miss one. A solver searches, and on a cost that drops at each break point it stops at whichever interval it started in.

The Incremental Sheet, and a Warning

The sheet builds the fixed part of the price recursively, without forming \(R_j\):

\[ \begin{aligned} H_1 = 0, \qquad H_j &= (c_{j-1} - c_j)\,q_j + H_{j-1} = R_j - c_jq_j &&\text{the saving on $q_j$ units already bought}\\ H_2 &= (0.30 - 0.29)(500) = 5, \quad H_3 = (0.29 - 0.28)(1000) + 5 = 15 &&k_j = H_j + 8 = 8, 13, 23 \end{aligned} \]

Two levels survive: 400 at $204.00 and 518.62 at $204.58. Order 400. The sheet has no candidate columns, so its evaluator prices whichever is typed in, and both look plausible.

What the Worksheets Do Not Do

They evaluate; they do not choose. Every sheet prices an entered quantity faithfully. Only the all-units sheet enumerates alternatives, and only because someone laid the enumeration out in columns.

They do not know their own assumptions. The production sheet guards \(p > \lambda\) and nothing else. Nothing checks that demand is constant, the lead time known, or backorders permitted.

They round after the fact. The ROUNDUP column shows the integer to be ordered, but the costs are computed at the unrounded quantity. That is negligible for the classic item, and not for an item sold only in cases.

Those three are what the code adds. Why it is shaped as it is lives in the book’s appendix on designing the course software; here we use it.

Build, Choose, Evaluate, Read

Every software section of the book takes its item through the same steps.

val sheet = CostParameters(demandRate = 100.0, unitCost = 8.0, orderCost = 20.0,
    holding = HoldingCost.carryingCharge(0.25 / 12.0), leadTime = 0.25,
    timeUnit = TimeUnit.MONTH)                                  // build
val best = EconomicOrderQuantity.optimize(sheet)                 // choose
val chosen = EconomicOrderQuantity.evaluate(sheet, 200.0)        // evaluate
chosen.penaltyAgainst(best)                                      // compare

Each argument is a symbol: demandRate is \(\lambda\) per month, unitCost is \(c\), orderCost is \(k\), the carrying charge is \(i\) per month, and leadTime is \(L\) in months. timeUnit is the worksheet’s units column, made a required argument.

The Classic Sheet in Code

println(best.report())
Economic order quantity
  Inputs                lambda = 100 per month, k = 20,
                        h = 0.1667 per unit per month, L = 0.25 month
  Order quantity        154.9193 units  (155 rounded up)
  Cycle length          1.5492 month
  Order frequency       0.6455 orders per month
  Average on hand       77.4597 units
  Reorder point         25.0000 units  (25 rounded up)
  Ordering cost         12.91 per month
  Holding cost          12.91 per month
  Relevant cost         25.82 per month
  Purchase cost         800.00 per month
  Total cost            825.82 per month
  Ready rate            1.0000
  Chosen by             ClosedForm

Every figure is the sheet’s. The inputs line says which item the report answers, the rounded companions are the ROUNDUP column, and Chosen by says the quantity came from the formula rather than a search.

One Evaluator Row, by Hand

The evaluator prices \(Q = 200\) against \(Q^{*} = 154.9193\). The code reports

  Q =  200.0   ratio 1.03279556   difference +0.846778   relative error 0.03279556

What does the penalty formula give?

\[ \frac{C(200)}{C^{*}} = \tfrac{1}{2}\left(\frac{200}{154.9193} + \frac{154.9193}{200}\right) = \tfrac{1}{2}(1.2910 + 0.7746) = 1.0328 \]

and the difference is \(C^{*}(1.0328 - 1) = 25.82 \times 0.0328 = \$0.85\) a month.

Discounts and Refusals in Code

  level   break   price    candidate   feasible    total cost   chosen
      1       0    0.30     400.0000        yes      204.0000
      2     500    0.29     500.0000        yes      198.1000    <--
      3    1000    0.28    1000.0000        yes      200.8000
  order 500.0000 at a total cost of 198.1000

  level   break   price    candidate   feasible    total cost   chosen
      1       0    0.30     400.0000        yes      204.0000    <--
      2     500    0.29     518.6189        yes      204.5799
  order 400.0000 at a total cost of 204.0000

The candidate columns have become the candidate list the answer carries, and ranking the incremental levels is the operation itself: the 58 cents is not left to the reader to notice.

  a zero backorder cost:
    A backorder cost of zero makes shortages free rather than forbidden. Use ShortagePolicy.NotPermitted, which is the limit as the cost grows without bound. See @sec-eoq-nobackorders.
  a rate below the demand rate:
    The replenishment rate must exceed the demand rate, but 80.0 is not greater than 100.0

What We Did Today

Every worksheet has four blocks: inputs with units, intermediate calculations, an evaluator and an optimizer, joined by three sensitivity rows.

One MOD call is the whole reorder point, and the production sheet is the order model with \(h' = h(1 - \lambda/p)\).

Discount columns enumerate candidates; a solver searches, and an evaluator prices whatever it is given.

The code takes the item through build, choose, evaluate and read, reports which inputs it answers, ranks discount candidates itself, and refuses what it cannot model. One evaluator row, \(Q = 200\), checks by hand at 1.0328.

For Next Time

Read before next session: When Items Stop Being Independent and A Constrained Lot Sizing Problem, in the multi-item chapter.

Today’s material was Building These Models in a Spreadsheet and The Same Models in Code. Why the code is shaped as it is lives in the book’s appendix on designing the course software.

Next session:

  • When items share a scarce resource, and must be decided together
  • The Lagrange multiplier as a surcharge on holding, found by bisection
  • What a budget limit costs, and why it shrinks every item by the same factor

Every item next session is a classical EOQ. Bring the square-root formula.