Many Items, Running Systems, and Choosing a Policy

Manuel D. Rossetti, PhD P.E.

Agenda

  • Many items under one ordering capacity and one service figure
  • Why equal service is not efficient, shown on the storeroom with no search
  • Where \(\lambda\), \(\theta\) and \(\sigma_{D(L)}\) come from in a running system
  • One procedure for every policy of this chapter and chapter 8
  • The two sheets of this chapter, and the same models in code

Many Items at Once

The items do not couple through the physics. Each has its own demand, lead time and lead time demand, and nothing in the exact model refers to another item. They couple through what they share: one storekeeper, one budget, one service figure the organization reports.

A common backorder cost \(b\) per unit per year. Each reorder point meets its own critical ratio:

\[ G_{j}(r_{j}^{*}) = \frac{b}{b + h_{j}} \]

A common stockout cost \(\pi\) per unit short. The order quantity enters:

\[ G_{j}(r_{j}^{*}) = \frac{\pi\lambda_{j}}{\pi\lambda_{j} + h_{j}Q_{j}} \]

Either way the order quantities are the multi-item EOQs, \(Q_{j} = \sqrt{2A\lambda_{j}/h_{j}}\), with \(A\) the shared ordering cost. Notice that the second form depends on \(Q_{j}\) and the first does not.

Two Constraints, Two Loops

When neither the ordering cost nor the shortage cost can be defended, both become constraints, a largest average order frequency \(F\) and a smallest average fill rate \(\beta\):

\[ \min \; \text{inventory investment} \quad\text{subject to}\quad \overline{\mathit{OF}} \le F, \quad \overline{\mathit{FR}} \ge \beta \]

Search on the two multipliers in turn: adjust \(A\) until the order frequency binds; then, holding \(A\), adjust the shortage cost until service binds.

The order matters. \(A\) sets the \(Q_{j}\), the \(Q_{j}\) appear in the stockout condition, so the reorder points depend on \(A\). The reverse is not true. Settling order frequency first converges; the other order chases itself.

The constraints are checked with the exact measures even though the parameters come from the approximation: choose with the approximation, quote with the exact model, as before.

Equal Service Is Not Efficient

An average service target does not imply an equal one. In Hopp and Spearman’s example the search gives 99.5% to a cheap, fast part and 74.9% to an expensive, slow one, on the way to a 95% average.

Suppose the storeroom adopts the cutout’s \(b = \$287.50\) for every item. What ready rate does that imply for the transformer?

Item \(h_j = 0.25c_j\) \(b/(b+h_j)\)
Pad-mount transformer $950.00 0.2323
Fuse cutout $28.75 0.9091
Smart meter $23.75 0.9237
Riser conduit $15.50 0.9488
Meter socket $12.00 0.9599
Splice kit $7.00 0.9762
Ground rod $3.50 0.9880
Compression connector $0.85 0.9971
Warning tape $0.53 0.9982

From 23.2% to 99.8% across one storeroom, and nothing but the unit cost produced the spread.

The transformer’s own \(b\) is $8,550, thirty times the cutout’s, and gives \(8550/9500 = 0.90\). The shared figure applies the cutout’s penalty to an item worth thirty-three times as much.

A constraint on the average does not claim every item has the same penalty.

Every Parameter Has Arrived as a Given

In a running system none of \(\lambda\), \(L\), \(k\), \(h\), \(b\) is given, and none stands still. Let \(t_{F}\) represent the basic forecast period and \(\hat{D}_{t}\) the forecast of one period’s demand, revised at the end of period \(t\). Then \(\lambda = \hat{D}_{t}/t_{F}\), the rate as of period \(t\).

Let \(\mathit{MAD}_{t}\) represent the smoothed mean absolute deviation of the one period ahead forecast error. Converting it to a standard deviation takes an assumption:

\[ \begin{aligned} E\big[|X - E[X]|\big] &= \sigma\sqrt{2/\pi} &&\text{for a normally distributed error}\\ \sigma_{D} &= \sqrt{\pi/2}\;\mathit{MAD}_{t} \approx 1.2533\,\mathit{MAD}_{t} &&\text{invert} \end{aligned} \]

The normal enters here, and nowhere else

It converts a scale estimate of the forecast error. It is not a statement about the shape of \(D(L)\), which is still chosen by the variance to mean ratio. Confusing the two is how the normal gets into a lead time demand model without anyone deciding to put it there.

Carrying Them Over a Lead Time

Let \(\eta\) represent the scaling exponent, and \(L/t_{F}\) the number of forecast periods in a lead time:

\[ \theta = \frac{\hat{D}_{t}}{t_{F}}L, \qquad \sigma_{D(L)} = \sigma_{D}\left(\frac{L}{t_{F}}\right)^{\eta}, \qquad \tfrac{1}{2} \le \eta \le 1 \]

\(\eta = \tfrac{1}{2}\) is the square-root rule, right when one-period errors are independent. Raise \(\eta\) toward 1 as they become positively autocorrelated, which is what a forecast slow to follow a change in level produces.

A check on the transformer. Monthly forecasts, \(\hat{D}_{t} = 3.75\), \(\mathit{MAD}_{t} = 1.55\):

\[ \begin{aligned} \lambda &= \frac{3.75 \text{ units}}{1 \text{ month}} \times \frac{12 \text{ months}}{1 \text{ year}} = 45 \text{ units per year}\\ \sigma_{D(L)} &= 1.2533(1.55)\sqrt{2} = 1.94\sqrt{2} = 2.75 \text{ units} \end{aligned} \]

against 2.74 from the Poisson. At \(\eta = 1\) it is \(1.94(2) = 3.89\), 42% higher, and the safety stock rises with it.

Which Parameters Move, and How Often

The fixed order cost is the workload rate times the item’s workload; it changes when the process does, not when an item’s demand does.

The holding cost follows the item’s value, \(h = ic\), so a repriced item has a new \(h\) whether or not anyone recomputed one.

The lead time varies by item, and its variance can contribute more to \(\mathit{Var}[D(L)]\) than the demand does.

The two parameters do not deserve equal attention. \(Q\) is flat near its optimum, so a \(Q\) from a stale \(\lambda\) costs very little. \(r\) sits in the tail of \(D(L)\), where a small shift in \(\theta\) or \(\sigma_{D(L)}\) moves the fill rate visibly. Recompute \(r\) on the forecast’s own cycle, and \(Q\) when \(\lambda\) has moved enough to matter.

The Other Sheets, and What No Sheet Can Do

Periodic needs three Poisson means where the others need one: the start, middle and end of the review interval. Nine columns, combined with Simpson’s weights 1, 4, 1 into \(\bar{G}\) and \(\overline{G^{1}}\). The label beside the mean exposure \(\lambda(L + R/2)\) says it is not \(\lambda\tau\).

Lumpy builds the compound Poisson mass function upward by Panjer’s recursion, with \(\nu = \lambda_{e}L\) the expected number of epochs:

\[ \begin{aligned} g(0) &= e^{-\nu}\\ g(x) &= \frac{\nu}{x}\sum_{y \le x} y\,P\{Y = y\}\,g(x-y) \end{aligned} \]

One term per distinct lot size: three for the cutout. The mass sums to one and returns \(\theta\), and neither is forced.

No sheet for the \((s, S)\) policy. Its position is the stationary vector of a Markov chain, found by iterating until nothing moves, and a sheet cannot iterate without a macro. The approximation is sheetable: Evaluate with \(r = s\), \(Q = S - s\), and the corrected order frequency.

No sheet for the multi-item search. Two nested searches over thousands of items is a program.

Two conventions everywhere. No macros: every number comes from the formula in its own cell. Lead time demand is never modeled with a normal.

Choosing a Policy Form

If the item … Use Sheet Code
may choose its review interval \((R, S)\) at each interval Periodic RSModel.atInterval
is on a calendar fixed by others \((R, S)\) Periodic RSModel.optimalLevel
is watched, in lots, ordering up to a level \((s, S)\) with undershoot Evaluate, \(r = s\) by simulation
is watched, with demand in lots \((r, nQ)\) on compound Poisson Lumpy RQModel, LotSize
is watched, one unit at a time chapter 8’s table

Every row ends at a base-stock or \((r, Q)\) calculation on some distribution.

The Same Steps, Extended at the Front

  1. Fix the exposure: \(L\) when watched, \(\tau = R + L\) on a calendar, and average over the cycle.
  2. Build the demand over it: compound Poisson moments if it comes in lots.
  3. Choose the family: lots raise the variance to mean ratio.
  4. Choose the policy form from the table.
  5. Compute with the equation, sheet or class.
  6. Check: \(R \to 0\) returns base stock; lots of one return unit demand.
  7. Report the unit fill rate apart from the ready rate when demand is lumpy.

The Same Models in Code

val transformer = RSModel(
    demandRate = 45.0, orderCost = 220.0,
    holdingCost = 950.0, backorderCost = 8550.0,
    leadTime = months(2.0), reviewInterval = months(1.0),
    demand = DemandOverInterval.poisson(45.0),
)
val p = transformer.evaluate(transformer.optimalLevel())
  order-up-to level     14 units
  fill rate             0.8928
  cost per year         $8397.22

The cutout in lots is RQModel with LeadTimeDemand.compoundPoisson and a LotSize: \((25, 75)\), ready rate 0.9060, unit fill rate 0.8978.

One Output Line, by Hand

The listing also reports, at \(S = 14\), expected backorders of 0.1501 and expected on hand of 4.7751. Rebuild the on hand from the backorders, with \(L\) two months and \(R\) one.

\[ \bar{I} = S - \lambda\left(L + \frac{R}{2}\right) + \bar{B} = 14 - 45\left(\frac{2}{12} + \frac{1}{24}\right) + 0.1501 = 14 - 9.375 + 0.1501 = 4.7751 \]

What We Did Today

Items couple through what they share, and equal service is the expensive way to meet an average. One shared \(b\) ran the transformer at a 23% ready rate.

Parameters come from the forecast, and the normal enters only to convert a MAD. \(r\) deserves attention every cycle; \(Q\) does not.

One procedure covers both chapters. The calendar, the lots and the order-up-to rule are new questions at the front; every answer is still a base-stock or \((r, Q)\) calculation.

The two chapters in one line. Everything is a functional of the demand over the exposure; every policy is base stock averaged over a uniform quantity.

For Next Time

Read before next session: the opening of Multi-Echelon Inventory Systems, Where Should the Stock Sit? and Ordering One Unit at a Time.

Today’s material was Many Items at Once, Updating \(r\) and \(Q\) in a Running System, Choosing and Applying a Model, and the worksheet and software sections of this chapter.

Next session:

  • A second stock point, and the question of where the stock should sit
  • Repairable items, one-for-one replenishment across two levels
  • Why the base-stock model of these chapters is the building block there too

Bring the base-stock model. The next chapter stacks it.