time Avg Instantaneous Util
time average instantaneous utilization. Time with no capacity counts as zero, so under a capacity schedule this is lower than scheduledUtil, which divides by the capacity on shift.
time average instantaneous utilization. Time with no capacity counts as zero, so under a capacity schedule this is lower than scheduledUtil, which divides by the capacity on shift.